Work Item
ASTM WK91097

Revision of E481-23 Standard Practice for Measuring Neutron Fluence Rates by Radioactivation of Cobalt and Silver

Rationale

E10.05 needs a philosophy for addressing the burn-up correction. Is it done on an energy-bin basis or on a spectrum basis?
E10.05 needs a convention for wording of “duration of exposure” or “duration of irradiation”. Since this affects all E10 standards, this should be referred to E10.93.

Details

Developed by Subcommittee: E10.05

Committee: E10

Staff Manager: Stephen Mawn

Work Item Status

Date Initiated: 06-10-2024

Technical Contact: Michael Reichenberger