Work Item
ASTM WK90364

Revision of E2816-20a Standard Test Methods for Fire Resistive Metallic HVAC Duct Systems

Rationale

This work item is with intent to submit a ballot to incorporate the time correction clause bringing it in line with the likes of E119, E814, E1725, and E2307 to name a few that all utilize the E119 time/temperature exposure as does E2816.

Details

Developed by Subcommittee: E05.11

Committee: E05

Staff Manager: Kevin Shanahan

Work Item Status

Date Initiated: 04-18-2024

Technical Contact: Michael Kerrison

Item: 000

Ballot:

Status: